|
▪
Home was completely wrapped with 1" styrofoam insulation which added another R5 Value.
|
▪
Windows were replaced with Milgard Triple E.
|
|
▪
3/8" Sub-Floor was added before the installation of the new cork and laminate flooring.
|
▪
Exterior of home has Can Exel Siding which will never need to be painted.
|
|
▪
Decks are all 2X8 treated on 12" centers with big foot footings and sonatube.
|
▪
Pellet Stove in living room for energy savings.
|
|
▪
City's new sewer/water line has been installed in 2011 to the house.
|
▪
New Bathroom Reno is now complete.
|